Anbez Innovations has been awarded the pivotal contract for the Owelle Erosion Control Project in Anambra State, Nigeria. This essential infrastructure project is aimed at addressing severe erosion challenges in the region, protecting both local communities and critical infrastructure from environmental degradation.

Anbez’s environmental engineers and geotechnical experts are implementing comprehensive erosion control solutions, including reinforced drainage channels, slope stabilisation, and vegetation replanting. By employing advanced techniques and sustainable practices, Anbez is committed to minimising further land erosion, enhancing soil stability, and preserving the surrounding ecosystems.

The Owelle Erosion Control Project highlights Anbez’s expertise in delivering impactful environmental infrastructure projects. Once completed, this project will safeguard the area, ensuring long-term resilience for communities and supporting sustainable land use in Anambra State.

Technical Details & Metrics

  • New terminal building area: 65,000 square meters
  • Additional runway length: 3,800 meters
  • Runway surface: High-strength concrete with anti-skid treatment
  • New taxiway network: 12 km total length
  • Upgraded air traffic control system
  • Advanced baggage handling system capacity: 3,000 bags per hour
  • Passenger boarding bridges: 12 new installations
  • Increased annual passenger capacity: from 15 million to 30 million
  • Aircraft movements per hour: increased from 25 to 45
  • New check-in counters: 100
  • Additional gates: 8
  • Reduction in average taxi time: 30%
  • Improved on-time performance: 25% increase
  • Energy efficiency improvement: 35% compared to the old terminal
  • Expected completion time: 36 months
  • Projected economic impact: ₦500 billion annually to the local economy