Construction of Oraukwu Road

Client

ORK

Start Date

April 2019

End Date

Ongoing

Anbez Innovations has been selected to undertake the transformative construction of Oraukwu Road in Anambra State, Nigeria. This critical infrastructure project is designed to enhance transportation links, boost economic activities, and provide safer and more efficient access for residents and businesses in the area.

Anbez’s experienced civil engineering team is leading the development of the new road, which includes lane expansions, advanced drainage systems, and improved pedestrian walkways. Using high-quality materials and sustainable construction practices, Anbez aims to deliver a road that meets rigorous safety and durability standards while minimizing impact on the local environment.

The Oraukwu Road project underscores Anbez’s commitment to fostering regional growth through quality infrastructure. Upon completion, the road will stand as a lasting asset, facilitating better mobility and contributing to the economic vitality of Anambra State.

Technical Details & Metrics

  • New terminal building area: 65,000 square meters
  • Additional runway length: 3,800 meters
  • Runway surface: High-strength concrete with anti-skid treatment
  • New taxiway network: 12 km total length
  • Upgraded air traffic control system
  • Advanced baggage handling system capacity: 3,000 bags per hour
  • Passenger boarding bridges: 12 new installations
  • Increased annual passenger capacity: from 15 million to 30 million
  • Aircraft movements per hour: increased from 25 to 45
  • New check-in counters: 100
  • Additional gates: 8
  • Reduction in average taxi time: 30%
  • Improved on-time performance: 25% increase
  • Energy efficiency improvement: 35% compared to the old terminal
  • Expected completion time: 36 months
  • Projected economic impact: ₦500 billion annually to the local economy